GET /api/v0.1/hansard/entries/106460/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 106460,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/106460/?format=api",
    "text_counter": 105,
    "type": "speech",
    "speaker_name": "Mr. Nguyai",
    "speaker_title": "The Assistant Minister, Office of the Deputy Prime Minister and Ministry of Local Government",
    "speaker": {
        "id": 113,
        "legal_name": "Lewis Nganga Nguyai",
        "slug": "lewis-nguyai"
    },
    "content": "8 Wednesday, 7th April, 2010(A) (a) The tender for reconstruction of the Eldama Ravine Bus Park was awarded on 10th November, 2006 at a contract sum of Kshs151, 265,781.90 and the contractor was issued with the order to commence the works on 26th February, 2007. However, the contractor failed to fulfil even the most basic of his contractual obligations. These included, failure to provide his own site office to receive official correspondence from the engineer, failure to provide site staff as he resided in Nairobi, failure to provide equipment or workshop on the site, inadequate provision of insurance and failure to comply with a number of site instructions, including reminders. In general, there was a failure to meet the contractual obligations and the contract period ended before the contractor had fully commenced the works. Consequently, the contract was terminated. (b) The Ministry will repackage the bus park project afresh. It is amongst the tenders on the list to be advertised in 2010/2011 Financial Year."
}