GET /api/v0.1/hansard/entries/1076755/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 1076755,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1076755/?format=api",
"text_counter": 500,
"type": "speech",
"speaker_name": "Nominated, JP",
"speaker_title": "Hon. David ole Sankok",
"speaker": {
"id": 13166,
"legal_name": "David Ole Sankok",
"slug": "david-ole-sankok"
},
"content": "The SGR is only 12 kilometers shy of Narok Town, but for the Suswa Economic Zone, we have already constructed 52 kilometers to Emurtoto. The 52 kilometers is a bare misuse. It is open for vandalism. Construction of 12 kilometers would have given the SGR economic viability by opening up the Great Lake Region, Narok, part of the Northern Tanzania, South and Central Rift. It would be transporting wheat, barley, potatoes, animal byproducts, soapstone and even fish from Kisumu. I do not know why it stalled. I plead with the Government and with my President, if I have wronged you in any way, forgive me. Do not punish Narok residents because of some of us. If MPs from that region have joined Tanga Tanga, please do not punish the two million voters from that region because of some of us. Let us have the SGR completed at least to a town, even if it is not to Kisumu, through Bomet and Kisii as envisioned earlier, let it fall where there is road accessibility. Only motorbikes access where the SGR has ended. No vehicle can reach Emurtoto. It is only a motorcycle or a bicycle."
}