    "content": "country has. When it was conceptualised, the company that was meant to construct the project was supposed to construct transmission line together with power stations. Then, instead of doing that, it was decided that they would construct the line separately with the birth of the Kenya Electricity Transmission Company (KETRACO). As usual, all over the world, if a company has already finished its part and you are not ready to collect the renewable energy or power, then you have to pay what is being generated."
}