GET /api/v0.1/hansard/entries/1174366/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 1174366,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1174366/?format=api",
    "text_counter": 1111,
    "type": "speech",
    "speaker_name": "Mvita, ODM",
    "speaker_title": "Hon. Abdullswamad Nassir",
    "speaker": {
        "id": 2433,
        "legal_name": "Abdulswamad Sheriff Nassir",
        "slug": "abdulswamad-sheriff-nassir"
    },
    "content": "I would like to go the Kenya Airports Authority (KAA), which signed a very huge and ambitious plan. The whole idea was to have a new building or terminal with a capacity of 8.7 million passengers per year, and a floor with 178,000 square metres. Once completed, it was meant to have 50 international and 10 domestic check-in positions; 32 contact and 8 remote gates which had 45 stands and linking taxiways. This is something that is very noble in nature. However, the contract sum was USD64,745,354.25. The cost of contract supervision was USD8.83 million. There are clauses in this contract which are vital for Members to take note of. For instance, Clause 5 of the contract said that the contractor would bring on board a financier of the project. What happened? Anhui Construction Engineering Group Limited in joint venture with China National The electronic version of the Official Hansard Report is for information purposesonly. A certified version of this Report can be obtained from the Hansard Editor."
}