GET /api/v0.1/hansard/entries/118830/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 118830,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/118830/?format=api",
"text_counter": 171,
"type": "speech",
"speaker_name": "Mr. Chanzu",
"speaker_title": "",
"speaker": {
"id": 11,
"legal_name": "Yusuf Kifuma Chanzu",
"slug": "yusuf-chanzu"
},
"content": "Mr. Speaker, Sir, I have got very serious concerns about this Question, particularly part âcâ of the answer because the Assistant Minister has not satisfactorily answered it. One, the selection of the contractors by the Post-Qualification Regional Term Contracts (PQRTC) is causing a lot of favouritism. Two, anybody using that road knows very well that the workmanship from Kisumu to Chavakali is totally different from the workmanship beyond those two places. Mr. Speaker, Sir, when the Assistant Minister says that the contractors carried out the work as specified in the contract, he is implying that either there is something amiss about the specification or something is totally wrong about the contract. The money that has been spent on this road was not worth it. The road started peeling off even before a kilometre was done. What is the Ministry doing about the contractor who did a shoddy job, particularly the one from Kisumu to Chavakali? I am told that the same contractors are being awarded the job from Luanda to Majengo and the work is not being done. The same thing is happening on the road from Chavakali to Kapsabet."
}