    "id": 119301,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/119301/?format=api",
    "text_counter": 117,
    "type": "other",
    "speaker_name": "",
    "speaker_title": "",
    "speaker": null,
    "content": "(a) The total cost of the recently launched East African Marine Systems Cables was US $105 million. (b) The project started actual operations on the 21st August, 2009. ( c) The fibre optic cable is armoured and buried in the seabed so as to ensure its safety. The landing stations are also manned and protected 24 hours. However, accidents do occur, especially if big ships anchor on the cable’s path; that can be detected and repairs can be done. (d) My Ministry has put in place the following mechanisms to ensure optimum use of the facility."
}