GET /api/v0.1/hansard/entries/120113/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 120113,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/120113/?format=api",
"text_counter": 46,
"type": "speech",
"speaker_name": "Mr. Kinyanjui",
"speaker_title": "The Assistant Minister for Roads",
"speaker": {
"id": 48,
"legal_name": "Lee Maiyani Kinyanjui",
"slug": "lee-kinyanjui"
},
"content": "(b) The Government is carrying out a detailed design for the construction of a bypass to Likoni from Miritini on the Mombasa-Nairobi Highway through the old explosive jetty to Tsunza Peninsula over water to Bombo and connecting the proposed Dongo Kundu Port and Likoni-Ukunda Road (A14) near Ngâombeni. Another link will be constructed to connect the new road to the new Kipevu terminal built by the Kenya Ports Authority (KPA). The project design is expected to be completed in May 2010, and thereafter my Ministry will source funding for the implementation of the project."
}