GET /api/v0.1/hansard/entries/121910/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 121910,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/121910/?format=api",
"text_counter": 150,
"type": "speech",
"speaker_name": "Mr. Kiilu",
"speaker_title": "",
"speaker": {
"id": 45,
"legal_name": "Peter L. N. Kiilu",
"slug": "peter-kiilu"
},
"content": "asked the Minister for Energy:- (a) to inform the House when the Kwasomba (Emali/Masumba and Matiliku/Kilili Rural electrification projects, which were constructed in 2007, will be commissioned; (b) what the cost of each project is; and, (c) why Spring Hill Youth Polytechnic, Kwakivoko Market, Tutini Borehole and Kalima Market, which are situated along Kwasomba- Masumba power line, were not connected during the construction of the power line."
}