"speaker_name": "Eng. M.M. Mahamud",
"speaker_title": "The Assistant Minister for Energy",
"speaker": {
"id": 373,
"legal_name": "Mohammed Maalim Mahamud",
"slug": "mohammed-mahamud"
},
"content": "Mr. Deputy Speaker, Sir, I beg to reply. (a) These projects are complete save for the installation of a transformer. We are expecting transformers within this month. The projects, hopefully, will, therefore, be commissioned in December, 2009. (b) The costs for each project were as follows: Masumba/Emali, Kshs20.6 million and Matiliku/Kilili, Kshs7.5 million (c) As for the Spring Hill Youth Polytechnic, this polytechnic was constructed well after the project was completed and is not, therefore, connected. For the Kwakivoko Market, this is a very small market and hence the estimated costs were not included in the projects. For the Tutini Borehole, the borehole is not along the Masumba Power line and, therefore, was not part of the coverage. It is located 1.3 kilometers off the power line. As for the Kalima Market project, I am informed that this market does not exist on the ground along the Masumba power line. What exists is the Kalima Primary School. Mr. Deputy Speaker, Sir, the area Member of Parliament has, so far, also not submitted a request to the Ministry for electrification of the above projects. Once he does so and subject to funds being available, this project shall be considered for funding. Thank you, Mr. Deputy Speaker, Sir."
}