GET /api/v0.1/hansard/entries/1233154/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 1233154,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1233154/?format=api",
"text_counter": 336,
"type": "speech",
"speaker_name": "Mwingi Central, WDM",
"speaker_title": "Hon. Gideon Mulyungi",
"speaker": null,
"content": " Thank you, Hon. Deputy Speaker. I wanted to seek some further clarifications. I wanted to find out whether the Cabinet Secretary will allocate an adequate budget for the Nguni-Nuu Road because if you pay the Ksh72 million, which you have allocated in this financial year, and the pending bill is Ksh175 billion, the contractor will definitely not go back to the site. Therefore, I need that clarification. Secondly, there are heaps of murram which were left on the road and a one-way site road provided. Because of that, there have been many accidents and we have lost many people. We need that intervention, so that the road becomes passable and we do not continue losing lives because of a stalled project and negligence by the contractor. The Kalisasi–Mumbuni Road does not terminate at Mumbuni Shopping Centre. The terminus is at Musukini, so you can make that correction. Musukini is one kilometre away while Mumbuni is five kilometres away. My wish is for the road to reach Mumbuni. You also need to clarify that because the funds to construct the road up to Musukini Shopping Centre were removed through the Supplementary Budget. Therefore, the road ended in the bush instead of going to the shopping centre. I want to find out whether you will reinstate that budget-cut to enable the road to reach Musukini Shopping Centre. The other one is the Mwingi–Slaughter House Road. There is no road called Mwingi MTC–Nzeluni–Miambani Road. Miambani goes to Kitui Town, which is about 50 kilometres away, but this road was only 3.7 kilometres long. If you can get the road to that distance of 50 kilometres, it will be better for me and the people of Mwingi Central. The contractor only did the bitumen and left out services like water, reinstatement of pipes and street lighting. Culverts The electronic version of the Official Hansard Report is for information purposesonly. A certified version of this Report can be obtained from the Hansard Editor."
}