GET /api/v0.1/hansard/entries/1233164/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 1233164,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1233164/?format=api",
"text_counter": 346,
"type": "speech",
"speaker_name": "t",
"speaker_title": "",
"speaker": null,
"content": "Hon. Deputy Speaker, I have also attached to my report the exact works that are going to take place on this important road because Kenyans have asked that the hustlers are using the road below while those who are incapable of paying for the Expressway need to be facilitated to use the road like other users who are able to pay to use the Expressway. I think Hon. Kosgei had asked about what we are doing on this road. We have construction of walkways, 12 bus bays, a new pedestrian underpass at the University of Nairobi student tunnel, a number of box culverts, drainage channels, protection of works and stone pitching near Jomo Kenyatta International Airport, and drainage improvement, which Kenyans who ply Mombasa Road have complained that it becomes like a lake when it rains. This is because some of the areas like Imara Daima are being re-opened and extended to 3.5 kilometres to enable discharge into Ngong River along Outering Road. We also have construction of 21 kilometres of pedestrian walkways and concrete pavements along Mlolongo auxiliary lane. There is comprehensive work to restore the A8 27-kilometre road which will begin on the 26th of April, that is, in a week’s time as indicated here. The works were contracted to two different contractors who must be on site."
}