GET /api/v0.1/hansard/entries/1240279/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 1240279,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1240279/?format=api",
    "text_counter": 502,
    "type": "speech",
    "speaker_name": "Mr. Davis Chirchir",
    "speaker_title": "The Cabinet Secretary for Energy and Petroleum",
    "speaker": null,
    "content": "With respect to the transformers, you have asked me to state when the transformers in the following areas would be supplied: Bulla Power, Qobo Dabacity, Bulla Qolati, El Safara Mosque, Bulla Moyale, Bula Nguvu, Al-Uteybi A and B, Bulla Wagberi, Elwak Post Office and its environs, El-Hache and its environs, Elwak Girls Primary School and its environs, Bulla Gesrebki, Bulla Watiti, Bulla Duse, El Ram A, Abbey Umur (Elram B), and Chachabole, Irres Kinto, Elele, Allo Boji, Kobb Adadi, Tutes and Burmayo. The REREC has identified 28 projects in Mandera South Constituency which will be implemented once the budget is available. Hon. Members, because of popularity of this project to power our economy, homes and our lives, I ask you that we work together to make sure that we get the budget. The projects inquired and their status are summarised in the table provided. I have shown the projects for which the designs have been completed and we are waiting for availability of budget. We should be able to finish Bulla Power in respect of project plans for survey, design and make budget availability as shown from item number two to the last one on Elwak Post Office and its environs all the way to Burmayo."
}