GET /api/v0.1/hansard/entries/1242502/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 1242502,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1242502/?format=api",
"text_counter": 229,
"type": "other",
"speaker_name": "",
"speaker_title": "",
"speaker": null,
"content": "i. Contracts signed by IPPs, detailing the cost, capacity and duration of the contractual agreements and their implications on affordability of electricity in the country; ii. Discrepancy in the cost of electricity sold to Kenya Power by KenGen, imports from Ethiopia and IPPs; and iii. The diversion of the electricity generated by Lake Turkana Wind Power to the national grid, bypassing the inadequately supplied northern frontier counties of Marsabit and Samburu. b) Ministry of Energy to come up with a policy framework aimed at- i. Lowering the cost of electricity as a way of addressing the high cost of living; and ii. Enhancing clean energy by switching to renewable sources of energy such as geothermal power, wind energy, among others as a way of reducing the carbon footprint."
}