GET /api/v0.1/hansard/entries/126222/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 126222,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/126222/?format=api",
"text_counter": 257,
"type": "speech",
"speaker_name": "Mr. Kiunjuri",
"speaker_title": "The Assistant Minister for Water and Irrigation",
"speaker": {
"id": 175,
"legal_name": "Festus Mwangi Kiunjuri",
"slug": "mwangi-kiunjuri"
},
"content": " Mr. Speaker, Sir, I apologize for being late. However, I beg to reply. I am aware of the plans to construct the dam for irrigation and power generation in Arror River Basin in 1986. Kerio valley Development Authority (KVDA) commissioned M/s Bebingg Consulting Engineers of Milan, Italy, to carry out a feasibility study for a multi-purpose scheme. The study indicated the suitability of the project to generate hydro-power and develop a potential area of about 6,460 hectares for irrigation. The project has not been implemented due to lack of funds. The cost of project implementation was estimated at US$240 million. That is an equivalent to Kshs16.803 billion."
}