GET /api/v0.1/hansard/entries/126840/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 126840,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/126840/?format=api",
"text_counter": 192,
"type": "other",
"speaker_name": "",
"speaker_title": "",
"speaker": null,
"content": "and not the Kenya Power and Lighting Company (KPLC). However, if there are clients who have lodged complaints, we are ready to follow it up so that we can ascertain where the blame can be apportioned. (b) Mr. Deputy Speaker, Sir, the situation has been rectified by the installation of a second generator, which I said was of 400 kilowatts, in June, 2009, which has enhanced the generation capacity in Lodwar and its surroundings to 1.3 megawatts. Consequently, the residents can now enjoy a reliable and steady supply of electricity. We are also doing an upgrade in Lodwar Town at the cost of Kshs7.6 million. We are also doing the same at Nadikonye Market, which is within that area, at the cost of Kshs8.9 million and at Nakwamekwi Market, at the cost of Kshs10 million. Finally, we are also working on Nabet, Akwanga, Nakujula shops, Naiwatoron Secondary School at the cost of Kshs6 million so that it can enhance the access to electricity within Lodwar."
}