    "id": 137049,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/137049/?format=api",
    "text_counter": 101,
    "type": "other",
    "speaker_name": "",
    "speaker_title": "",
    "speaker": null,
    "content": "(d) The list of development projects initiated by TARDA in Masinga Constituency since inception is as follow: Masinga Dam was built at the cost of Kshs1.2 billion. It was commissioned in 1982 with the objective of providing integrated development in the region. Two, Masinga Dam Resort was built at a cost of Kshs60 million and completed in 1989. Third, it initiated catchment conservation programmes, which includes afforestation, tree planting and terracing. Fourth, it initiated road networks with 35 kilometres. This road joins Kamburu-Kiambeere and a second road of 80 kilometres that joins Kanyoro-Embu Road. Thank you."
}