GET /api/v0.1/hansard/entries/1378973/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 1378973,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1378973/?format=api",
    "text_counter": 79,
    "type": "speech",
    "speaker_name": "Hon. Njeru",
    "speaker_title": "The Cabinet Secretary for Water, Sanitation and Irrigation",
    "speaker": {
        "id": 278,
        "legal_name": "Peter Njeru Ndwiga",
        "slug": "peter-ndwiga"
    },
    "content": " Thank you, Mr. Speaker, Sir and hon. Senator, for that question. We have two projects: The Marsabit Water Supply and the sewer projects under the KTSWSSP. For the water, we are done. What is remaining is the last mile connectivity, which is among the proposals we have done to the African Development Bank (ADB) requesting them to allow us use money from the savings. So, I assure the Senator that those projects will be commissioned soon once we are done. We have a 6.2-kilometer area that had some issues. One of the issues was on land. However, now that we are through with that, I assure you, in the shortest time possible, we will be coming there to commission those two projects."
}