GET /api/v0.1/hansard/entries/139313/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 139313,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/139313/?format=api",
"text_counter": 347,
"type": "other",
"speaker_name": "",
"speaker_title": "",
"speaker": null,
"content": "Under Sub-Vote 300, Head 429, Kshs12 billion will be used to complete a study on the demand of petroleum products to determine the size and timing for the construction of the second oil pipeline from Mombasa to Nairobi. The Minister informed the Committee that KPC has no capacity to pump products up country to satisfy the demand and that petroleum tankers are used to supplement the supply of products. The Committee recommends that further allocations towards this expenditure be stopped as the construction of another pipeline from Mombasa is long overdue. From the Ministerâs comment, it is evident, therefore, that a second pipeline is needed and, therefore, no need for further studies to determine whether this is feasible."
}