GET /api/v0.1/hansard/entries/1393680/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 1393680,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1393680/?format=api",
    "text_counter": 110,
    "type": "speech",
    "speaker_name": "Sen. Lomenen",
    "speaker_title": "",
    "speaker": {
        "id": 2940,
        "legal_name": "James Lomenen Ekomwa",
        "slug": "james-lomenen-ekomwa"
    },
    "content": "(1) List villages in which REREC projects located and provide an update on the status of the operationalization. (2) State reasons for the delay in operationalisation of REREC projects in Turkana County, specifically, those commissioned in 2019, in areas including Kangakipur in Turkana South, Lopeduru in Turkana East, Kodopa and Nepeikar in Loima, Loturerei, Lolupe and Nayuu in Turkana Central, Turkana West and Kaeris in Turkana North, including the specific challenges faced and a revised actionable timeline for their completion. (3) State steps the Ministry of Energy is taking to expedite the design, supply, installation and commissioning of solar photovoltaic generation plant with associated power distribution network (mini grids) in Turkana County, with particular focus on Kalokol, Namukuse in Turkana Central, Lochwaangikamatak and Naposimoru in Turkana South, Lorengippi in Loima, LomunyenAkwan in Turkana East, Kaikor, Kanakurudio, Kibish, Kokuro, Oropoi and Nachukui in Turkana North and Oropoi in Turkana West, giving timelines. (4). State strategies being considered by the Ministry to ensure that electrification efforts in Turkana County also include the installation of flood lights in strategic centres and towns as well as stand-alone solar PV system for schools and health facilities to address broader social economic development goals. Thank you."
}