GET /api/v0.1/hansard/entries/140149/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 140149,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/140149/?format=api",
    "text_counter": 446,
    "type": "other",
    "speaker_name": "",
    "speaker_title": "",
    "speaker": null,
    "content": "Mr. Temporary Deputy Speaker, Sir, let me just mention about one of them – Arror Falls. Research has been done several times by Kerio Valley Development Authority (KVDA) and by the Ministry of Energy and it has been found that Arror Falls can generate up to 72 to 75 megawatts. The Government has not been willing to put up a project at the Arror Falls, and that is actually an embarrassment. I do not know the criteria that the Ministry or even the Government uses to set up those facilities. Like that one, feasibility studies have been done and placed in shelves! Some of them could generate 20 megawatts, 35 megawatts or even 40 megawatts. I wonder why that one has not been done and yet, it could generate up to 75 megawatts. I am referring to Arror Waterfalls, which has been cited by the Mover of the Motion, along with other rivers that can generate power. The water could still be used for irrigation."
}