GET /api/v0.1/hansard/entries/14195/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 14195,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/14195/?format=api",
    "text_counter": 169,
    "type": "speech",
    "speaker_name": "Mr. Shakeel",
    "speaker_title": "",
    "speaker": {
        "id": 140,
        "legal_name": "Ahmed Shakeel Shabbir Ahmed",
        "slug": "shakeel-shabbir"
    },
    "content": "Mr. Speaker, Sir, the Assistant Minister has given a very good reply. However, he has said that CDF officials need to give three months notice to the Ministry of Public Works. Ordinarily, that is given. The details he has given regarding Omollo Goro Bridge defies any explanation. A footbridge has been designed in the middle of the main road. Are cars going to stop at that main road for people to walk? Then, the Ministry gave a certificate of clearance for the money to be paid for Chiga Health Centre. The Ministry, again, gave a certificate of final completion and the building was irreparably cracked even before it was condemned. So, I am afraid that the answer by the Assistant Ministry does not address the actual facts. He is trying to cover the failures. I would like him to, please, have somebody to investigate. Could he, perhaps, be kind enough to come to the site so that I can show him what happened? That was done by the CDF Committee of my predecessor. Yes, we have since built the bridge during my tenure but, this time, with the involvement of the Ministry. But that also took us a lot of time. Could the Assistant Minister tell us what he is going to do and when he will visit us?"
}