"content": "(b) Meanwhile, as a short-term measure, the Kenya Power and Lighting Company (KPLC) is doing some work from Muhoroni Sub-station which comes all the way from Lessos Sub-station to Thurgem in Nyakach Constituency. This will connect to Katito, Pap Onditi, Sondu Miriu, Kendu Bay and finally to Homa Bay. That is a 33KV ring. Also a 33 KV ring is being constructed from Katito to Sondu, Chabera, Ringa, Oyugis and Kosele in Kasipul Kabondo and finally towards Homa Bay. Those are some of the reinforcement works which are being done, meanwhile, as a short term measure while awaiting the 133 KV line from Chemosit to Kegati Sub-station, which I have said, will be completed by December, 2009."
}