"speaker_name": "Hon. Zachariah Njeru",
"speaker_title": "The Cabinet Secretary for Water, Sanitation and Irrigation",
"speaker": null,
"content": "(a) the scope of laying 48.262 kilometres length of sewers ranging from diameter 225 millimetres to 900 millimetres. The completion status is at 89 per cent; (b) there was also the construction of public toilets at the Shaffi and Mandera military camps. These works are at 60 per cent completion; (c) there was the construction of wastewater stabilisation ponds with the capacity to treat an average of 6,000 cubic meters per day; (d) the water stabilization ponds consist of the following- (i) Inlet channel with measuring flume; (ii) Two anaerobic ponds; (iii) Two focaltative ponds; and, (iv) Six maturation ponds. The overall completion for the wastewater treatment works is at 61 per cent. (e) there were administration and laboratory buildings. These are at 92 per cent. (f) there were two staff houses, a perimeter chain link fence with concrete posts, and two gatehouses. These are at 95 per cent completion. (g) there is also the access gravel roads around the ponds. These are at a 10 per cent completion rate. (h) plant and equipment for operation and maintenance of the infrastructures. These have not yet been installed. The overall progress to date is 73 per cent work done. Mr. Speaker, Sir, in response to part (c) of the Question, the overall progress for the Mandera water project is 72 per cent, while the Mandera sewerage project is at 73 per cent. For the Mandera water supply project, the parties to the contract have currently agreed to mutually terminate the contract. A framework for the process has been agreed upon. The employer has constituted a claims adjudication committee for final valuation. The dispute has been referred to arbitration, and the proceedings are ongoing. In addition, the contractual parties are also at an advanced stage to enter a mutual agreement to separate. As regards the Mandera Sewerage Project, following the execution of the addendum works agreement by the contractor, an instruction for remobilisation and resumption of works was issued by the engineer. The contractor resumed work in March, 2024. Currently, some of the contractor's key personnel and construction materials have been mobilised to the site. The projected date of completion is 7th, July, 2024. The construction works are progressing very well. I think I can stop there and then I will answer the other question."
}