GET /api/v0.1/hansard/entries/142894/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 142894,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/142894/?format=api",
"text_counter": 148,
"type": "speech",
"speaker_name": "Mr. Kiunjuri",
"speaker_title": "The Assistant Minister for Water and Irrigation",
"speaker": {
"id": 175,
"legal_name": "Festus Mwangi Kiunjuri",
"slug": "mwangi-kiunjuri"
},
"content": " Mr. Temporary Deputy Speaker, Sir, I beg to reply. My Ministry is constructing Ndikiki Water Supply which will serve Ndindiruku, Kiumbi and Kianugu areas that are traversed by Murubara Stream on the downstream of the Mwea GK Prison. The project which is estimated to cost Kshs25 million is being funded by IFAD and is about 40 per cent complete. When completed, this project will ensure that the residents of these areas have access to safe drinking water so as not to draw water from Murubara Stream. The Government, through the Ministry of Home Affairs, is rehabilitating the sewage disposal system of the Mwea GK Prison to prevent any discharges of waste water into the Murubara water course. The rehabilitation measures already undertaken include the construction of a new septic tank, construction of two ablution blocks and the rehabilitation of existing dilapidated septic tanks---"
}