"content": "the Dongo-Kundu Road serves as a crucial bypass which connects Miritini and Kwale County with three bridges. To pave way for constructing the road, several residents surrendered their land with the legitimate expectation for compensation. In spite of the strategic nature of the bypass, which has lessened the time spent driving between Miritini Standard Gauge Railway Station and Diani from two-and-a-half hours to approximately 45 minutes, it is saddening that approximately Ksh1.4 billion that was meant for compensation was halted and is yet to be paid to the remaining beneficiaries. The situation is worsened by the fact that the road is now open and operational, making the residents uncertain about the status of their compensation."
}