"text_counter": 376,
"type": "speech",
"speaker_name": "The Cabinet Secretary for Roads and Transportation (",
"speaker_title": "",
"speaker": null,
"content": "Hon. Chirchir): It commenced on 27th September, 2021 and was completed on 16th December, 2021. The works involved site clearance, topsoil stripping, earthworks involving runway excavation, drainage works and all the works, including cutting of tall trees, relocation of overhead Kenya Power Company (KPC) lines on the final approach of the runway and preliminary items for mobilisation. That phase has been completed at a cost of Kshs49.9 million. The proposed second phase will involve cement stabilisation on the gravel base layer using some of those high-capacity cements for the 2.5N or provision and placement of 35mm asphalt concrete type 1 on the runway and all the associated work, including drainage work, construction of line drainage using invert block drainage with side slabs or stone pitching on the sides. The proposed Phase 3 will involve acquisition of additional 9.5 acres of land for the construction of the apron taxiway, car park, terminal building and offices. It will also involve the construction of apron taxiway and construction of passenger terminal building, offices, car parks and associated wastewater reticulation. The upgrading and rehabilitation works of this facility will be dependent on the allocation of funds."
}