    "type": "speech",
    "speaker_name": "Hon. Chirchir",
    "speaker_title": "The Cabinet Secretary for Roads and Transport",
    "speaker": {
        "id": 13110,
        "legal_name": "Zipporah Jepchirchir Kittony",
        "slug": "zipporah-jepchirchir-kittony"
    },
    "content": " Madam Temporary Speaker, I wish to state that the construction of Kenol-Sagana-Marwa Road is still ongoing in some sections and the final road marking will be done once the works are completed. Currently, there are temporary markings on the final layer, where the traffic has been allowed to use. As soon as we sign off with the contractor, we should quickly finalise the marking. This is a safety issue. Therefore, we will pay attention to it. Final road markings are in place for the following completed sections; Lot 1 is 48 kilometres for the entire road. Lot 2, which is a 17-kilometre section, has been taken over and, therefore, they are marking those areas. My technical team and the Ministry will undertake to ensure that the safety issues are immediately addressed because markings are the safety concern of the road users. The construction of the footbridge at Kenol is currently 60 per cent completed with steel fabrication for the deck underway at the fabricator’s yard. However, the footbridge near Komorori Primary School has faced delays due to pending land acquisition for the---"
}