GET /api/v0.1/hansard/entries/1484833/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 1484833,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1484833/?format=api",
    "text_counter": 95,
    "type": "speech",
    "speaker_name": "Kitutu Masaba, ODM",
    "speaker_title": "Hon. Clive Gisairo",
    "speaker": null,
    "content": "3. The process of equipment supply includes manufacture, inspection in the country of origin, shipment, clearance at the port of entry into Kenya, transport to Chamasiri TVC, installation, branding, testing, training, commissioning and handing over for use by the contractor. The slight delay in the delivery of equipment was occasioned by delays in pre-shipment inspection of equipment before shipment from the country of origin into Kenya. The first batch of the equipment was delivered to Chamasiri TVC on 3rd October 2024 as shown in the pictures below. The Member has a copy and he can see the pictures. 4. The supply, delivery, installation, training, and commissioning of the equipment to Chamasiri TVC is expected to be complete by 5th November 2024. The purpose of this communication is to forward a comprehensive response on the delayed delivery of equipment to Chamasiri TVC for reporting to the House by the Committee Chairperson. The response is signed by Dr. Esther Thaara Muoria, PhD, Principal Secretary."
}