    "id": 1495367,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1495367/?format=api",
    "text_counter": 251,
    "type": "speech",
    "speaker_name": "Mr Davis Chirchir",
    "speaker_title": "The Cabinet Secretary for Roads and Transport",
    "speaker": null,
    "content": "On the second area, which is the lanes on both sides, the right and the left-hand sides, the 38 kilometres programme, we have only executed and worked on 6.384 kilometres. There is an outstanding 31.616 kilometres. There are outstanding works at about 83 per cent, which is still quite significant. On the feeder road, which is 21.2 kilometres, we have finished works on 11.28 kilometres, and we have 9.92 kilometres to go, that is, 46 per cent of outstanding works. On the interchange slip roads and ramps, which is 20.86 kilometres, we have basically scratched the ground with only 0.2 kilometres. We have 20 kilometres to go, which is 99 per cent of outstanding works. On Gitaru Falls Clover Interchange, which is 5.594 kilometres, we have done 1.953 kilometres and there is 3.637 kilometres to go, which is 65 per cent of outstanding works. On the Non-Motorised Transport (NMT) footpath, that is the traffic lanes or walkways to ensure that we are pedestrian-friendly, which is 50.69 kilometres, I want to state that we have not started."
}