GET /api/v0.1/hansard/entries/150090/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 150090,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/150090/?format=api",
"text_counter": 245,
"type": "speech",
"speaker_name": "Mr. Kiunjuri",
"speaker_title": "The Assistant Minister for Water and Irrigation",
"speaker": {
"id": 175,
"legal_name": "Festus Mwangi Kiunjuri",
"slug": "mwangi-kiunjuri"
},
"content": "On the issue of when the Mzima II will be completed, I have been very consistent. There are two issues. There is the rehabilitation of Mzima Water Project which is 218 kilometres. Here, we are dealing with pipe replacement and other construction works that require Kshs3.1 billion. We then have the actual Mzima II Water Project which is coming up. These are two different projects."
}