GET /api/v0.1/hansard/entries/153685/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 153685,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/153685/?format=api",
"text_counter": 150,
"type": "speech",
"speaker_name": "Mrs. Ngilu",
"speaker_title": "The Minister for Water and Irrigation",
"speaker": {
"id": 111,
"legal_name": "Charity Kaluki Ngilu",
"slug": "charity-ngilu"
},
"content": " Mr. Speaker, Sir, I beg to reply. (a) I agree with the hon. Member that the rehabilitation of Mzima Pipeline Phase I has taken a bit longer than anticipated. This has been due to the lengthy and bureaucratic procedures involved in the loan acquisition and procurement. The rehabilitation of Mzima Pipeline is being undertaken under the Water and Sanitation Improvement Programme, which is funded by a World Bank loan. The rehabilitation works are estimated to cost Kshs1.8 billion and the World Bank approved funding of the project in December, 2007. The loan agreement was signed in June, 2008. Detailed design and preparation of tender documents is"
}