"content": "1. The faulty 1x1250KVA generator for M/S ENCOMM Power Rentals is being replaced. The substitute generator arrived on site on Sunday, 23rd March 2025 and installation and commissioning was completed by 26th March 2025. 2. Delivery of repair parts has been done and repairs are underway for the 2 units of 1250KW each. The Kenya Power (KP) awarded the repair contract to M/S Car & General and repairs are to be completed in the next two weeks due to importation of parts and actual repair works. Therefore, once the repairs and installation are done by the end of March, the load shedding affecting Mandera County will be completely resolved. The third question was about the long-term plans for stable power supply in the county, including exploring alternative avenues such as the acquisition of generators through Independent Power Producers (IPPs). The response is as follows: The medium-term solution is to have an IPP do a hybrid solar and diesel plant that will generate up to 10MW. The long-term plan is to get the grid to Mandera."
}