GET /api/v0.1/hansard/entries/1555874/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 1555874,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1555874/?format=api",
    "text_counter": 270,
    "type": "speech",
    "speaker_name": "Mandera South, UDM",
    "speaker_title": "Hon. Abdul Haro",
    "speaker": null,
    "content": "2. Reasons for the prolonged delay by KPLC in procuring and onboarding a consultant, including the status of onboarding the consultant as required by the donor. 3. Report on details of monthly diesel fuel supply requirements for the off-grid stations located in Elwak, Takaba, Banissa, Rhamu, Lafey and Mandera towns, and the KPLC operating costs for the Elwak Power Station from 2017 to 2024. 4. The status of the hybridisation project of Elwak Off-Grid Power Station, including specific timelines for completion of the remaining part of the project, deviation in timelines from the originally projected completion date, and the cost implications, if any. Thank you."
}