GET /api/v0.1/hansard/entries/161338/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 161338,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/161338/?format=api",
    "text_counter": 208,
    "type": "speech",
    "speaker_name": "Mr. Kiunjuri",
    "speaker_title": "The Assistant Minister for Water and Irrigation",
    "speaker": {
        "id": 175,
        "legal_name": "Festus Mwangi Kiunjuri",
        "slug": "mwangi-kiunjuri"
    },
    "content": "The Kerio Valley Development Authority (KVDA) commissioned M/s Degi Constructing Engineers of Milan, Italy, to carry out a feasibility study for a multipurpose scheme. The study indicated the suitability of the project to generate hydropower and develop a potential area of about 6,460 acres of irrigation. The project has not been implemented due to lack of funds. The cost estimates for the project implementation was approximated at Kshs16,803,000."
}