GET /api/v0.1/hansard/entries/166783/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 166783,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/166783/?format=api",
    "text_counter": 260,
    "type": "speech",
    "speaker_name": "Mrs. Ngilu",
    "speaker_title": "The Minister for Water and Irrigation",
    "speaker": {
        "id": 111,
        "legal_name": "Charity Kaluki Ngilu",
        "slug": "charity-ngilu"
    },
    "content": "My Ministry is implementing short-term measures aimed at improving piped water supply to Matiliku Town. These measures include construction of sub-surface dam across Kikuu River and drilling of two boreholes, pumping system, rising mains and distribution network. The long-term measures involve construction of a 25-kilometre pipeline from Nol-Turesh Pipeline to Matiliku Town. My Ministry is currently evaluating bids from consulting firms to undertake detailed design study for these works."
}