GET /api/v0.1/hansard/entries/178751/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 178751,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/178751/?format=api",
"text_counter": 146,
"type": "speech",
"speaker_name": "Mr. Kiunjuri",
"speaker_title": "",
"speaker": {
"id": 175,
"legal_name": "Festus Mwangi Kiunjuri",
"slug": "mwangi-kiunjuri"
},
"content": "Mr. Speaker, Sir, the feasibility study we are carrying out is for the expansion because as you agree with me, the population has been growing very rapidly. I agree, the river can be able to supply water and that is why we are increasing. We want to make sure that by 2013, we shall be able to supply 8,600 cubic metres of water. However, on the issue on whether Emuhaya is receiving 70 per cent of the water or 30 per cent, the issue here is where the pipe ends. Whereas the main pipe comes from Emuhaya and ends at Maseno, it does not mean that the distribution lines are in Maseno. The major distribution lines - those that are consuming the water - are in Emuhaya. Mr. Speaker, Sir, I can give examples. The areas being served in Emuhaya Constituency include Emusire, Kima Complex, Luanda Township, Esirabe, Esibila, Ebwali, Emabungo and all those areas. There are 16 areas that are being served by the distribution pipes, which means it is true 70 per cent is being consumed by Emuhaya Constituency. If you really doubt this, you can go on the ground and do the evaluation for yourself."
}