GET /api/v0.1/hansard/entries/179973/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 179973,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/179973/?format=api",
    "text_counter": 127,
    "type": "speech",
    "speaker_name": "Mr. Kinyanjui",
    "speaker_title": "The Assistant Minister for Roads",
    "speaker": {
        "id": 48,
        "legal_name": "Lee Maiyani Kinyanjui",
        "slug": "lee-kinyanjui"
    },
    "content": " Mr. Deputy Speaker, Sir, I beg to reply. I am aware that the road from Giakanja-Mukarara-Ihithe (D434), which leads to Gathuthi Tea Factory and other agricultural areas, is not in a very good condition. Road D434 is located in Nyeri South District in Central Province. It is a loop road which leads to Giakanja at the junction of Road C70 through Mukarara and ends in Nyeri Town, covering a distance of 20 kilometres. It covers mainly a tea-growing area. Road E580, which joins Tetu Constituency and Kinangop at Ndunyu Njeru, is the only access between Nyeri South and Nyandarua District. It is 50 kilometres long and runs between Tetu Township and Ndunyu Njeru at the junction with Road D389. The Ministry has appointed a consultant to carry out design work for the road. Once the design work is completed, the Ministry will source for funding to start the construction of the road. Thank you, Mr. Deputy Speaker, Sir."
}