"id": 190213,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/190213/?format=api",
"text_counter": 75,
"type": "speech",
"speaker_name": "Mr. Kinyanjui",
"speaker_title": "The Assistant Minister for Roads",
"speaker": {
"id": 48,
"legal_name": "Lee Maiyani Kinyanjui",
"slug": "lee-kinyanjui"
},
"content": " Mr. Speaker, Sir, I beg to reply. (a) The Ministry's engineers inspected Thika-Gacharage-Kangari Road on 30th January, 2008 and on 20th February, 2008 and they ascertained that the work was done to the specified levels. (b) The inspection revealed that the contractor did his work to the specifications given in his contract and, therefore, I have no intention of taking any action against the contractor. Further, the scope of the work specified was maintenance of the existing road, comprising of the reconstruction of about 30 per cent of the road, potholes and edge repairs and re-sealing of the entire road in order to save it from collapsing. The actual substantial completion inspection was done on 30th January, 2008, by a team of engineers and officers from the Ministry and the contractor for the resident engineer. The contractor will now maintain the road for a period up to February, 2010. The project's roads total about 40.2 kilometres, including the following:- (1) The Kandara Township roads, which include access to hospital, DO's office and police station, totals 2.1 kilometres. Work will start in September, 2008 and will be completed in October, 2008. (2) The access road to Rucho School, covering 0.7 kilometres, has already been completed. (3) The Kangare Town road, covering 1.5 kilometres, has already been completed. (4) Work on access road to Thakarara School, covering 0.5 kilometres, will start in September, 2008, and will be completed around October, 2008."
}