GET /api/v0.1/hansard/entries/190874/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 190874,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/190874/?format=api",
    "text_counter": 47,
    "type": "speech",
    "speaker_name": "Mr. C. Kilonzo",
    "speaker_title": "",
    "speaker": {
        "id": 46,
        "legal_name": "Charles Mutavi Kilonzo",
        "slug": "charles-kilonzo"
    },
    "content": "Madam Temporary Deputy Speaker, let me thank the Assistant Minister. However, I want to bring to his attention the fact that Yatta Canal, which was constructed during the colonial times, is a 50-kilometre canal which flows into Mwitasyano River. That means that it serves another 100 kilometres. In the other canal, the water flows to a maximum of 30 kilometres. There is no water in the other 30 kilometres. This affects areas like Kithendu, Matuu Town and Kateki, where there would be serious horticultural growing. In the last financial year, Kshs10 million was given for the same design, which was done. In part \"b\" of the answer, he has said that he has given more money for the design. The practice of the Government has been to do one design after another. I want to know when the Government will allocate money for the construction of the dam."
}