GET /api/v0.1/hansard/entries/191151/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 191151,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/191151/?format=api",
"text_counter": 97,
"type": "speech",
"speaker_name": "Mr. Kiunjuri",
"speaker_title": "The Assistant Minister for Water and Irrigation",
"speaker": {
"id": 175,
"legal_name": "Festus Mwangi Kiunjuri",
"slug": "mwangi-kiunjuri"
},
"content": " Mr. Deputy Speaker, Sir, I beg to reply. (a) I am aware that my Ministry has initiated 225 water point sources and boreholes from 1980 to mid 1993 and upgraded two boreholes. That is, C7865, Khalaba Primary School and C8385, Matungu Primary School since 2001, to piped pumping water schemes which are operational and are currently serving a total of over 56,000 and 2,000 people, respectively. (b) The Ministry has allocated Kshs3.9 million in the current Financial Year for the 1576 PARLIAMENTARY DEBATES July 2, 2008 construction of the proposed Matunga Rural Water Project, which will serve Matunga Trading Centre, divisional headquarters and the surrounding areas. The development of the borehole, construction of the 24 cubic metre elevated water storage tank, purchasing and installing submissible pumps and purchasing and installation of water metres. In addition, my Ministry has factored in the Budget for the Financial Year 2008/2009, Kshs2,495,000 for the extension and distribution lines for the on-going Matunga Rural Water Project. This distribution line, once complete, will serve an additional population of over 4,000 people."
}