"content": "Mr. Deputy Speaker, Sir, the works undertaken from the year 2005 include the following: (i) Construction of a 500 metre cubed reinforced concrete storage tank at Kshs8.5 million. (ii) Construction of a six-kilometre main pipeline comprising of a 200-millimetre diameter EPDC and steel pipes including auxiliary works and two kilometres of 50-millimetre diameter service line and drilling of a borehole on the bank of Sabaki River at Kshs18 million. (iii) Construction of power lines to the borehole at Kshs6.5 million totalling Kshs33 million. Currently, preparations for the testing of the pipeline and storage tanks for defects are being undertaken and the residents will start benefiting from the water supply once the testing has been completed."
}