GET /api/v0.1/hansard/entries/219951/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 219951,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/219951/?format=api",
    "text_counter": 57,
    "type": "speech",
    "speaker_name": "Maj. Sugow",
    "speaker_title": "The Assistant Minister for Water and Irrigation",
    "speaker": {
        "id": 142,
        "legal_name": "Aden Ahmed Sugow",
        "slug": "aden-sugow"
    },
    "content": " Mr. Speaker, Sir, I beg to reply. (a) I am aware that Maragua Town is supplied with piped water from Kigumo Rural Water Supply on a rationing basis. This is supplemented by water from a low-yielding borehole which operates daily. (b) I am aware that the 100-millimetre diameter pipeline from Kigumo Water Supply is inadequate to serve Maragua Town. A proposal to supply water to the town through a 300- millimetre diameter gravity pipeline from Kinyona Treatment Works was conceived early 2006 and my Ministry, through the Tana Water Services Board, is undertaking studies to determine viability of this proposal. (c) My Ministry will include the Kigumo Gravity Pipeline project and the Irati Intake Project in its budget, once the studies are completed and the cost estimates for undertaking these projects are determined."
}