"speaker_name": "Mr. Kinyanjui",
"speaker_title": "The Assistant Minister for Roads",
"speaker": {
"id": 48,
"legal_name": "Lee Maiyani Kinyanjui",
"slug": "lee-kinyanjui"
},
"content": " Mr. Speaker, Sir, I beg to reply. (a) I am aware that Katito-Kendu Bay Road has developed some potholes in some sections of the road. This is as a result of increase of construction traffic for Kendu Bay- Homa Bay Project; the irrigation works for Oluch-Kimira Small Holder Irrigation Scheme Project and Phase II of the Sondu Miriu-Sangoro Hydro Electric Power Station. (b) My Ministry, through the Kenya National Highways Authority made a budgetary allocation of Kshs784,242,687.20 out of which Kshs783,644,949.73 was spent on the rehabilitation of the road. The scope of works and specifications were as follows:- Site clearance, earth works, excavation to spoil of contaminated material, scarifying existing pavement layers comprising of surfacing, Graded Crushed Stones (GCS) base and sub-base process, improve with lime/ cement to form a 200mm thick layer for sub base for carriageway and shoulders, provision of 150mm thick layer of cement/lime, improved natural gravel as base for carriageway and shoulders; and, application of double seal of 14/20 mm and 6/10mm chippings using 80/100 penetration grade bitumen cut back. (c) My Ministry has set aside Kshs60 million in this financial year for carrying out the maintenance of the road and especially the sections which either have failed or show signs of weakening."
}