    "content": " Mr. Speaker, Sir, I beg to reply. (a) The Kenya Power and Lighting Company (KPLC) contracted M/s. Electral Works Company to supply, instal and commission 2x500 KVA generator sets in Mandera Power Station on 18th October, 2004. The work was to be executed within four months. The non-functioning of the Deutz Machines installed is technical, and not that the machines 4264 PARLIAMENTARY DEBATES December 7, 2006 were intended for motor vehicles. The main reason is that the generator's control panels and other associated electronic models could not match. However, investigations are being undertaken to establish the cause of the problem and solutions thereto. (b) All the laid-down procurement procedures were followed to the letter when awarding the tender to M/s Electral Works Company. It was the lowest evaluated compliant bidder. (c) Arrangements are being made to replace the two generating sets. In the meantime, a civil suit is being filed by KPLC against the supplier of the two diesel engines."
}