GET /api/v0.1/hansard/entries/229868/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 229868,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/229868/?format=api",
"text_counter": 125,
"type": "speech",
"speaker_name": "Eng. Toro",
"speaker_title": "",
"speaker": {
"id": 239,
"legal_name": "Joshua Ngugi Toro",
"slug": "joshua-toro"
},
"content": "Mr. Speaker, Sir, the Kshs75 million was not spent on the road. It was estimated that it would cost Kshs75 million, but the funds were not available to do that work. However, at the moment, we are looking at prioritization of Class A, B and C Roads. That is a Class C road. Due to the heavy rains in the Coast Province, the Ministry has surveyed the road. The most affected place is a 200 meters stretch at Puma, where vehicles cannot pass. The Provincial Roads Engineer is working on that section at the moment. The other area is the Mwachanda Bridge on Ramisi River, where the approaches to the bridge have been completely damaged by the floods. So, at the moment, we are doing something as we await for the prioritization of total rehabilitation of that road."
}