GET /api/v0.1/hansard/entries/231303/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 231303,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/231303/?format=api",
    "text_counter": 50,
    "type": "speech",
    "speaker_name": "Eng. Toro",
    "speaker_title": "The Assistant Minister for Roads and Public Works",
    "speaker": {
        "id": 239,
        "legal_name": "Joshua Ngugi Toro",
        "slug": "joshua-toro"
    },
    "content": " Mr. Speaker, Sir, I beg to reply. (a) I am aware that River Sio overflowed the Sio River Bridge on Road D256 connecting Butula Constituency with Nambale Constituency on 22nd November, 2006, and finally subsided on 2nd December, 2006. (b) Instructions have already been given to the District Works Officer, Busia to request the District Roads Committee to allocate adequate funds for the clearing of the River Sio Bridge drainage channel at the bridge so that the river can flow smoothly and thus reduce its likelihood of overflowing the bridge."
}