GET /api/v0.1/hansard/entries/241523/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 241523,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/241523/?format=api",
"text_counter": 136,
"type": "speech",
"speaker_name": "Mr. Wanjala",
"speaker_title": "The Assistant Minister for Water and Irrigation",
"speaker": {
"id": 295,
"legal_name": "Newton Wanjala Kulundu",
"slug": "newton-kulundu"
},
"content": " Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) I am aware that my Ministry designed Mukwa-Siboti-Kibuke Water Project in 2004 and its implementation is being funded by Bumula Constituency Development Fund (CDF). (b) Currently, my Ministry, through the Nile Basin Initiative, is implementing Angurai Water Supply, which is an expansion of Malaba/Kocholia Water Project. The expansion of this water project has been designed to link with Mukwa-Siboti-Kibuke Water Project. I would like to assure the hon. Member that the project will be linked up and be completed by January, 2007."
}