GET /api/v0.1/hansard/entries/241823/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 241823,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/241823/?format=api",
"text_counter": 133,
"type": "speech",
"speaker_name": "Eng.Toro",
"speaker_title": "The Assistant Minister for Roads and Public Works",
"speaker": {
"id": 239,
"legal_name": "Joshua Ngugi Toro",
"slug": "joshua-toro"
},
"content": " Mr. Deputy Speaker, Sir, I beg to reply. (a) The tarmacking of Chabera-Chebilat Road will begin once the design is completed. The design work was initially expected to be completed in March, 2007. My Ministry has allocated additional funds for the completion of the above works during the 2006/2007 Financial Year. As July 19, 2006 PARLIAMENTARY DEBATES 2169 soon as the design work is completed, the proposals for construction will be made. (b) The design work on the Chabera-Chebilat Road are on-going. The work is programmed to be completed in March next year. The contract for consultancy services for both the preliminary and detailed engineering design was awarded in March, 2005. The design work commenced on 8th July, 2005."
}