GET /api/v0.1/hansard/entries/250521/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 250521,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/250521/?format=api",
"text_counter": 53,
"type": "speech",
"speaker_name": "Maj. Sugow",
"speaker_title": "The Assistant Minister for Water and Irrigation",
"speaker": {
"id": 142,
"legal_name": "Aden Ahmed Sugow",
"slug": "aden-sugow"
},
"content": " Mr. Speaker, Sir, I beg to reply. (a) I am aware that the reconstruction of Munina Dam was undertaken in January, 2005, after the original dam constructed in the 1950s breached. The major components of the dam were funded by the Danish International Development Agency (DANIDA) while the community was required to provide materials and labour for construction of the spill-way protection. The spill-way is yet to be undertaken. This may cause dam failure in case of heavy floods. (b) My Ministry is liaising with the local community and the donor to raise the required funds so that the outstanding works are completed in the shortest time possible to save the dam from collapsing. (c) My Ministry will provide technical assistance and has always done so to the local and donor funded projects in planning, design and their implementation. A structure has been put in place to ensure that design reports for water projects are checked by the Water Resources Management Authority (WRMA) while the water services boards (WSBs) supervise construction of these projects."
}