GET /api/v0.1/hansard/entries/280643/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 280643,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/280643/?format=api",
"text_counter": 294,
"type": "speech",
"speaker_name": "Mr. Kinyanjui",
"speaker_title": "The Assistant Minister for Roads",
"speaker": {
"id": 48,
"legal_name": "Lee Maiyani Kinyanjui",
"slug": "lee-kinyanjui"
},
"content": " Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) The construction of Kisii-Keroka Road, that is B3, commenced on 27th July, 2010 and was completed within six months, in the period starting December 2010 and ended in June 2011. The construction of Daraja Moja Bridge commenced on 29th April, 2010 and was completed on 28th June, 2011. (b) The potholes emerging from some sections of the above road and the approaches to the bridge have been caused by a roadside carwash and leaking water pipes belonging to Lake Victoria South Water Services Board. As a result, Kenya National Highways Authority (KeNHA) is currently liaising with the water board in view of resolving the problem by re-routing the water pipes. I have instructed the Director- General of KeNHA to issue notices to the roadside carwash operators to vacate the road reserve. (c)As I have mentioned above, the damage to the road was caused by leaking water pipes and water from the roadside carwash. I have instructed the Director-General of KeNHA to send a technical team on the ground to assess the damage and submit a report. Appropriate action will be taken thereafter."
}